Project Management

Project controls

Meetings, RFIs, submittals, transmittals, punch, and ball-in-court on the job.

Start with one job 14-day trial
EstiLumina Project controls — live product

The job pressure

RFIs and punch sit in inboxes — ball-in-court is tribal knowledge.

Commercial PM; available broadly

On the job

RFIs and punch should not live in inboxes. EstiLumina keeps RFIs, submittals, and punch with owners, overdue pulses, and ball-in-court in Project controls.

Drawing pins can open an RFI or punch. External parties reply on a signed token portal when you need them in the loop. What’s-next prompts route work to the right queue.

Design team and field stay aligned on who owes the next answer — on the job, not in a buried thread.

How it works

  1. 1

    Build the OAC agenda from court, then file minutes and action items.

  2. 2

    Log RFIs, submittals, and punch with owners.

  3. 3

    Issue a transmittal cover when the current set or a package goes out.

  4. 4

    External parties reply via signed token portal when needed.

What you get

  • OAC / coordination / safety meetings with agenda and minutes
  • RFI / submittal / punch in one place
  • Ball-in-court and overdue accountability
  • Transmittal cover on issue
  • Drawing pins → RFI or punch
  • External signed-token reply portal

Why teams subscribe

  • Ball-in-court shows who owes the next reply
  • Overdue pulses surface stalled RFIs and punch
  • External parties can reply on a signed portal link

Honest boundaries

  • Not a public plan-room for the whole market.
  • Not a claim that every consultant already has an account.
  • Not a design-platform construction cloud or attested enterprise PM suite.
Job RunAccountability strip keeps the design team and field aligned.
Tasks & schedulingField app

Put this on your next job

Start with one job For subcontractors

Related

Job HomeMoney, activity, and approvals in one hub — with a clear next step.Team & collaborationEight roles with per-member overrides, per-job access, discussions with @mentions on every job surface, and one account across workspaces.Daily logs & activityOffice, awards, photos, and field notes in one living feed.
© 2026 Negi Enterprise Inc · EstiLumina
HomeFeaturesSubcontractors14-day trialHelpStart with one job